Skips for Mixed Building Waste
The mix that comes out of building work. Bricks, timber, tiles, packaging and everything in between.
This Is All Fine
Please Keep These Out
Which Size for Mixed Building Waste?
The Usual Builders Skip
For most building jobs it's a 6 or 8 yard. A 6 yarder does a small extension or a knock through, and an 8 yarder covers bigger jobs.
Long Jobs
If the job runs for weeks, don't let the skip overflow. Book a swap and you'll get an empty one in its place. Trade account holders can do this from their phone.
Tips That Save You Money
Plasterboard separate
It can't be mixed with other building waste. Book a separate bag.
Book a swap
On a long job, swap the skip when it's full instead of letting it overflow.
Level loads only
Builders get stopped for overloaded skips. Keep it level with the top.
Waste Questions
What building waste can go in a skip?
Bricks, blocks, timber, tiles, concrete, insulation offcuts, packaging and pipework are all fine.
Can you put plasterboard in a skip?
Not mixed in. Book a separate plasterboard bag.
What size skip for building waste?
A 6 yard for small jobs, an 8 yard for extensions and big renovations.
Can I put insulation in a skip?
Normal loft and wall insulation is fine. Old insulation board may contain asbestos, so check first.
Can I put old windows in a skip?
Yes. Wrap the glass if it's loose.
Can I put roof tiles in a skip?
Yes, clay and concrete tiles are fine.
Do builders need a waste transfer note?
Yes. Every business has to keep a note for each load. We give you one for every job.
Can I get a skip swap on a building site?
Yes. We take the full skip and leave an empty one in the same visit.
Can I put tins of paint in a skip?
No. Take them to the tip.
Is building waste recycled?
Most of it. Rubble gets crushed for roads, timber gets chipped and metal gets melted down.
Got a Job On? Get a Skip.
Or ring us on 01257 000 000